Set up the table
Enter paired stage and discharge values in ascending stage order. Keep the unit in each heading so the table can be read on its own.
| Stage (m) | Discharge (m³/s) |
|---|---|
| 2.50 | 0.84 |
| 3.00 | 1.62 |
| 3.50 | 2.75 |
| 4.00 | 4.18 |
Example table for Mill Bend. These numbers are for practice and should be replaced with measured local pairs.
Find the interval
For a sample reading of 3.25 m, the stage falls halfway between 3.00 m and 3.50 m. The matching discharge therefore sits halfway between 1.62 and 2.75 cubic metres per second.
- Lower pair: 3.00 m and 1.62 m³/s
- Upper pair: 3.50 m and 2.75 m³/s
- Position in interval: 0.25 m out of 0.50 m, or one half
- Discharge: 1.62 + half of (2.75 - 1.62) = 2.19 m³/s when rounded to two places
Review the result
Keep the measured stage and the converted discharge in the same record. Include the interval so a later reader can see which part of the table produced the value.
- Within the table: interpolate between the nearest two pairs.
- Below or above the table: mark the reading for review instead of extending the line.
- Changed channel: update the table from new measurements before relying on it.
Check before export. A discharge value is only as clear as its stage input, unit labels, and rating interval.