Guide 02

Gauge readings

Record a stage value that another reader can understand without guessing what happened at the channel.

Before you write

Use the station reference prepared in the first guide. Confirm the gauge is readable and note any visible obstruction. If the gauge has moved, record that observation with the reading rather than changing the reference.

Record the stage

Read the water level against the staff, then enter the value in metres. Keep the same precision from one visit to the next so the trend has the same meaning.

FieldSample entryWhy it matters
StationMill BendLinks the value to one reference
Stage3.12 mKeeps the unit beside the number
TrendRisingDescribes change without a chart
Rainfall11 mmAdds channel context
Warning stage3.80 mShows the comparison point

Choose a trend label

Trend is a reading label, not a prediction. Keep it short and tied to the observations you actually have.

Compare with the warning stage

Marlbrook places the warning level beside the current stage. In the sample above, 3.12 m sits below the 3.80 m warning stage. If a value sits above that line, review the reading and any field note before using it in a conversion.

Keep notes useful

Good notes describe what a number alone cannot: a still pool after rain, debris at the staff, or a blocked intake. Avoid long narratives. A short phrase travels more cleanly into review and export.

Sample values are for practice. For a channel record, enter the stage and rainfall measured at that station.

Continue to rating curves